The company was founded in 2005. In 2008, a 155-meter tunnel kiln was built. In 2009, a comprehensive building was built. In 2011, the company completed the “coal to gas” project in the tunnel kiln, and dismantled the gas generator, the downdraft kiln and other equipment to build a fully automatic high-temperature shuttle kiln, and established a production and research base in cooperation with Henan University of Science and Technology to establish chemical analysis and physical testing. Laboratory. In 2012, a fully automatic high-temperature shuttle kiln was built and equipped with related equipment. In 2013, the office building of the sales department was completed. In 2014, a micro-compound building was built and equipped with a docking automatic batching system. In 2015, a special high-temperature material workshop was built, equipped with 1250T press, 630T press, 500T hydraulic press and other equipment. In 2016, a high temperature tunnel kiln was under construction.

"/>

久久99热这里只有精品国产I国产黄色大片I麻花豆传媒一二三产区I草久在线观看I成人在线电影观看I久久超碰97I免费在线91I国产综合视频在线观看I国产一二三四在线视频I97国产大学生情侣白嫩酒店I色先锋av资源中文字幕I91精品国产自产老师啪I国产三级视频在线I91人人干

ABOUT US

aboutus

發(fā)展歷程-english.jpg